Auger Project
Engineering Array

Photo Gallery


First Bunch of  6 Tanks
Second Bunch of  6 Tanks
Oct 16th - Nov 1st
Nov 7th - Nov
Tank Receiving Tank Receiving
  • On the Truck1
  • On the Truck1
  • On the Truck2
  • On the Truck2
  • In the CNEA
  • Downloading in the CNEA1
  • From CNEA to Galpon
  • Downloading in the CNEA2
  • Reception at the Galpon
  • Reception at the Galpon
  • Tanks Inside the Galpon
  • Tanks Inside the Galpon
  •    
    Tank Preparation Tank Preparation
  • Tank Washing
  • Tank Washing
  • Brackets Drilling
  • Liner Inspection
  • Brackets Riveting
  • Liner Insertion1
  • Testing Brackets
  • Liner Insertion2
  • Gasket Gluing1
  • Liner Insertion3
  • Gasket Gluing2
  • Liner Inflating1
  • Gasket Gluing3
  • Liner Inflating2
  • Liner Unfolding
  • Hatch Cover Installation
  • Liner Inspection
  • Wick Installed
  • Venting Hole Drilling
  •  
    Tank Deployment Tank Deployment
  • Leaving the Galpon
  • Leaving the Galpon
  • Arriving at Site
  • Arriving at Site
  • Unloading1
  • Deploying Solar Panels
  • Unloading2
  • Stuck in the Mud (with Magale)
  • Moving to Position1
  • Moving to Position2
  • Placing at Position
  • Solar Panel Installation1
  • Solar Panel Installation2
  • Updating Traveller
  •  
    Deployed Tanks Deployed Tanks
  • Carmen (NEA07)
  • Cach (NEA01)
  • Susana (NEA17)
  • Kiam Wah (NEA03)
  • Clara (NEA02)
  • Magale (NEA22)
  • Paula (NEA08)
  • Midori (NEA30)
  • Milena (NEA09)
  • Claudia (NEA14)
  • Fabia (NEA21)
  • laudo@cbpf.br
    Nov 16th 2000