Auger Project
Engineering Array
Photo Gallery
First Bunch of 6 Tanks
Second Bunch of 6 Tanks
Oct 16th - Nov 1st
Nov 7th - Nov
Tank Receiving
Tank Receiving
On the Truck1
On the Truck1
On the Truck2
On the Truck2
In the CNEA
Downloading in the CNEA1
From CNEA to Galpon
Downloading in the CNEA2
Reception at the Galpon
Reception at the Galpon
Tanks Inside the Galpon
Tanks Inside the Galpon
Tank Preparation
Tank Preparation
Tank Washing
Tank Washing
Brackets Drilling
Liner Inspection
Brackets Riveting
Liner Insertion1
Testing Brackets
Liner Insertion2
Gasket Gluing1
Liner Insertion3
Gasket Gluing2
Liner Inflating1
Gasket Gluing3
Liner Inflating2
Liner Unfolding
Hatch Cover Installation
Liner Inspection
Wick Installed
Venting Hole Drilling
Tank Deployment
Tank Deployment
Leaving the Galpon
Leaving the Galpon
Arriving at Site
Arriving at Site
Unloading1
Deploying Solar Panels
Unloading2
Stuck in the Mud (with Magale)
Moving to Position1
Moving to Position2
Placing at Position
Solar Panel Installation1
Solar Panel Installation2
Updating Traveller
Deployed Tanks
Deployed Tanks
Carmen (NEA07)
Cach (NEA01)
Susana (NEA17)
Kiam Wah (NEA03)
Clara (NEA02)
Magale (NEA22)
Paula (NEA08)
Midori (NEA30)
Milena (NEA09)
Claudia (NEA14)
Fabia (NEA21)
laudo@cbpf.br
Nov 16th 2000